This multi-floor infrastructure upgrade requires installation of
new bulk 02 lines throughout the entire existing hospital, as well
as a new chiller, cooling tower, and generator.
The existing dual-generator setup will be discontinued, and the 02 line from an underground bulk tank farm will be run to the hospital basement, up nine floors, refeeding all of the existing oxygen outlets, as well as the new ICU.
Completion of the project is anticipated for January of 2009.
This project, along with , was part of a
joint award for Erickson, with a combined value totalling over $9,400,000.
|