Project Profile

Industrial

Pennsauken Reclamation Waste Management Authority

This 28,000 square foot solid waste processing facility features a clearspan pre-engineered building on an extensive concrete foundation.

The work included installation of a large compactor / bailer unit, and an elevated operator control booth. This facility extended the volumetric life of the existing landfill by compacting municipal waste to 10% of its curbside volume.